Home Propulsion Vehicles Satellites Aether Network
Company
About Us Newsroom Careers Contact
Kerolox · Methalox · Hydrolox

Engineering the
Path Off-World

United Space Explorers designs and tests liquid rocket engines across three propellant families, builds the heavy-lift vehicles they power, and is constructing an orbital network built to reach the places fiber never will.

3Propellant Families
240+Static-Fire Tests Logged
2Vehicles in Development
6Satellites on Orbit
Propulsion

Three Propellants.
Purpose-Built.

Every mission profile has a different propellant problem. We'd rather build the right engine than force one engine to solve all of them.

Kerolox

Forge

Dense, storable, and built for raw first-stage thrust. Forge is the booster workhorse behind Horizon Heavy.

230,000 LBF · ISP 312S VAC

View Specifications
Methalox

Ember

Full-flow staged combustion, rated for 40 reuses, and ISRU-relevant. Ember flies both stages of Pathfinder.

215,000 LBF · ISP 358S VAC

View Specifications
Hydrolox

Glacier

The highest efficiency we build. A closed expander cycle that powers Horizon's upper stage to GTO and beyond.

90,000 LBF · ISP 449S VAC

View Specifications
Flagship Vehicle

Horizon Heavy-Lift

A two-stage heavy-lift vehicle built around seven reusable Forge engines and a single Glacier upper stage. Horizon is sized for the missions that need both raw mass to orbit and the precision to get to GTO and cislunar space.

Height71 m
Payload to LEO34,000 kg
Payload to GTO12,500 kg
StatusQualification Testing
Aether Network

A Mesh of Light Around the Earth

Aether is a laser-meshed low Earth orbit constellation, designed to deliver broadband to maritime, aviation, rural, and government users wherever terrestrial fiber doesn't reach. The first six satellites are already on orbit.

2,800Satellites at Full Constellation
<30msTarget Latency
2Orbital Shells

Latest From USX

View All News
Government

USX Selected to Supply Upper-Stage Engines for National Security Launch Program

May 12, 2026

Aether Network

First Six Aether Network Satellites Reach Orbit

March 4, 2026

Vehicles

Pathfinder Completes Fourth Booster Reflight in Under 30 Days

January 22, 2026

Join the Program

We're Building the
Next Launch Manifest

From propulsion test stands to satellite integration floors, we're hiring engineers and technicians who'd rather build flight hardware than talk about it.